Minimize

Projects

List of Projects » Petrochemical » Project Details
  
Project's Name: Fajr 2
Client: Fajr Petrochemical Co. 2
Accomplished Date: 2011
Status: Accomplished
Main Products:  Heat Recovery Steam Generators | Package/Industrial Boilers | De-aerator
Description: Designing, supplying, manufacturing, installing and pre-commissioning 2 HRSG and 1 Aux. boiler

Weight of facilities manufactured in Iran: 5.800 Ton

Peripheral utilities including 2 De-aerators

Each HRSG capacity: 740 T/hr. (HP Steam) and 35 T/hr. (LP steam)

Each Aux. boiler capacity: 165 T/hr. (HP Steam)

vapor pressure: 42 bar-a

Vapor temperature: 420˚ C